SUMMERWOOD RESIDENTIAL DEVELOPMENT

Gel Flocculant blocks installed in creek flows and storm mains cut turbidity at a residential SWMF, clearing sediment plumes across four connected ponds within a week.

Location: Summerwood residential development

The Challenge

Stormwater runoff carried high levels of fine sediment into the SWMF pond. Large cleared areas lacked vegetation, leaving soils exposed during early construction. A nearby creek added additional sediment loads, raising turbidity and impacting downstream water quality.

The Solution

Clearflow combined standard erosion controls with Gel Flocculant technology matched to the site’s soil and water conditions. Gel Flocculant blocks were installed in key creek flow areas and mains leading to the pond, flocculating particles to achieve clearer water without power or dosing equipment.

Results

Turbidity dropped immediately, eliminating sediment plumes at creek and storm-drain inlets. Residual flocculant improved clarity across all four connected ponds, including those without Gel blocks. Visible improvements occurred within one week, with lab tests confirming sustained reductions in suspended solids. Performance remained consistent year-round, with faster settling at warmer temperatures.

Outcome:

Improved stormwater system performance accelerated pond maturation and function, reduced sediment transport downstream, and supported long-term water quality throughout the residential development. Historical results are examples, not guarantees.

Field record

Proof from the field

Site photography, lab results and drawings recorded as the work was carried out.

A green Gel Flocculant block anchored in a shallow creek flowing toward the stormwater pond
Fig. 01
Gel Flocculant blocks set in the key creek flow areas and mains feeding the pond.
Sediment-laden stormwater discharging from a concrete culvert into the pond
Fig. 02
Runoff from large cleared areas carried fine sediment straight into the pond.
The stormwater pond inlet at Summerwood, lined with rip-rap
Fig. 03
The stormwater management facility serving the Summerwood residential development.
Clear water running over cobbles in the creek after treatment
Fig. 04
Turbidity dropped immediately, eliminating sediment plumes at the creek and storm-drain inlets.
The Summerwood stormwater pond holding clear water with homes in the background
Fig. 05
Improved stormwater performance and clarity across all four connected ponds.

Measured results

Fig. 06The facility design — sedimentation trap, rip-rap spillway and the limit of surface construction.

Delivered with our partners

Backed by a global distributor network

Clearflow projects are delivered with regional resellers and contractor-installers across North America, the UK & Europe, Brazil and Australia.

Find your regional partner

Partner with us

Want to deliver projects like this?

We're appointing resellers and installers in new territories.

Become a distributor

Need a site match?

Our lab matches your water or soil sample to the right Clearflow product - free jar testing available.

Start a site assessment