Municipal/Stormwater
STORMWATER MANAGEMENT FACILITY CITY OF WATERLOO
City of Waterloo Pond 53 used Gel Flocculant for dewatering clarification and Ultrabind for sediment binding-part of an approximately $1.3M retrofit with follow-on municipal awards.

Location: Storm Pond 53, Waterloo, Ontario, Canada
The Challenge
The City of Waterloo’s Storm Pond 53 (~3,000 m³) was at capacity and needed an environmentally responsible method to dewater and transport sediment sludge from the stormwater management facility.
The Solution
Clearflow provided a Gel Flocculant reactor and Gel Flocculant for clarification into a constructed ditch lined with treated geo-jute. Aquatic safety, simplicity, and efficacy were major factors in approval for use.
Ultrabind thickened the Pond 53 slurry with minimal added mass. Compost was added to make an amended soil; after approval, ~300 m³ was applied to municipal boulevards, saving substantial landfill tipping fees, with reported growth benefit on amended soils.
In 2018 the City of Waterloo awarded an approximately $1.3 million storm-pond retrofit for passive Gel Flocculant treatment and Ultrabind sediment binding. Due to that success, Peterborough and Innisfil Ontario awarded follow-on pond treatment and redesign retrofits starting 2019. Historical results are examples, not guarantees.
Field record
Proof from the field
Site photography, lab results and drawings recorded as the work was carried out.









Delivered with our partners
Backed by a global distributor network
Clearflow projects are delivered with regional resellers and contractor-installers across North America, the UK & Europe, Brazil and Australia.
Find your regional partnerPartner with us
Want to deliver projects like this?
We're appointing resellers and installers in new territories.
Become a distributorNeed a site match?
Our lab matches your water or soil sample to the right Clearflow product - free jar testing available.