Heavy Construction

Consumers Energy Saginaw Lake Pipeline

GFR1000 reactors treated 3.4 million gallons of hydrostatic test water from 28 miles of pipeline near Flint, Michigan-cutting TSS by 37 mg/L for Flint River discharge.

Consumers Energy Saginaw Lake Pipeline

Location: Saginaw Trail near Flint, Michigan

The Challenge

Pipeline right-of-ways often have limited space for large water treatment equipment, and landowners need to be compensated for work on their property, which can add to project costs. Welded Construction needed a compact, simple, effective, and affordable method to dewater the pipeline at an efficient rate. In 2018, the contractor required treatment of hydrostatic testing water discharged from 28 miles of 24” high-carbon steel pipeline for Consumers Energy Services on the Saginaw Lake pipeline project near Flint, Michigan.

The Solution

Clearflow’s Gel Flocculant Reactors (GFR1000) were chosen. The treated water was sent via a constructed ditch lined with Clearflow’s Treated Jute for filtration and ultimately discharged directly into the Flint River.

Results

Achieving a 37 mg/L reduction in TSS and returning water to the Flint River of a higher quality than the river itself proved the GFR1000’s capabilities. Successful treatment of 3.4 million gallons in 2018 ensured the units would be deployed again in 2019 on a second replacement-section hydrostatic test discharge. Historical results are examples, not guarantees.

Field record

Proof from the field

Site photography, lab results and drawings recorded as the work was carried out.

Excavators lowering sections of 24-inch steel pipeline into the Saginaw Trail right of way
Fig. 01
28 miles of 24-inch high-carbon steel pipeline going in along the Saginaw Trail right of way.
Clearflow Gel Flocculant Reactors plumbed in line on the pipeline right of way
Fig. 02
GFR1000 Gel Flocculant Reactors plumbed straight into the discharge line — no power and no dosing equipment.
Gel Flocculant Reactors set on timber mats beside the treated discharge ditch
Fig. 03
Reactors set on timber mats, keeping the whole treatment footprint inside the existing right of way.
Crew working on pipeline sections beside an oversize load truck
Fig. 04
Welded Construction on the 2018 hydrostatic test section, ahead of the 2019 replacement section.

Measured results

Fig. 05The Saginaw Trail pipeline route between Saginaw and Milford, Michigan.

Delivered with our partners

Backed by a global distributor network

Clearflow projects are delivered with regional resellers and contractor-installers across North America, the UK & Europe, Brazil and Australia.

Find your regional partner

Partner with us

Want to deliver projects like this?

We're appointing resellers and installers in new territories.

Become a distributor

Need a site match?

Our lab matches your water or soil sample to the right Clearflow product - free jar testing available.

Start a site assessment