Highway 400

On Highway 400 an overpass was being constructed. With spring rain and runoff starting to become an issue, Clearflow was called in to protect a nearby stream.

On Highway 400 an overpass was being constructed. With spring rain and runoff starting to become an issue, Clearflow was called in to protect a nearby stream. Lynx Treated Soil Stabilization Fabric and Soil Lynx were used to enhance existing BMPs. Within 24 hours a large rain event occurred and Soil Lynx was put to the test. The results were amazing. The next day the project manager decided to add Soil Lynx to the areas previously untreated.