top of page

Item List

Commonwealth
Stadium

Highway 400

On Highway 400 an overpass was being constructed. With spring rain and runoff starting to become an issue, Clearflow was called in to protect a nearby stream.

Highway 897

Highway 897 ditches were heavily eroded; left untreated, this can cause major problems. Alberta Transportation contacted Clearflow for a solution.

Lac la Biche

At this Lac La Biche project the scope of Work included Clearing and Stripping, Separation and Stabilization

Stantec Big Lake Project

The project was installed in an extreme environment with temperatures reaching -25 below.